Redmond

SEPA determination of non-significance – sale of property interests to Sound Transit

Gentlemen:

The description of this proposal states “The property interests proposed for sale do ot overlap with any recreational facilities on the north side of Marymoor…”

This is extremely misleading inasmuch as the proposed transit route obliterates the gap between the East Lake Sammamish trail and the Redomond central connector trail, precluding the completion of a trail that the cycling community has been anticipating for years.

Both trails now dead end at arbritrary, non-destination, points. Considering the energy and resources that the county and city have invested in their fragments, it would be very unfortunate if they were not to be connected. There is no good pedestrian / bicycle access to the bear creek trail system from the east and unless it is expected that all transit users will drive to the train this must be corrected.

Shoreline made trail construction in the right of way a condition for permitting Sound Transit in their jurisdiction. King County should do the same while it still has something that the transit agency wants.  To give them this property without requiring them to build the trail connection would be a serious disservice to County taxpayers.

 

From the August 2018 ENVIRONMENTAL RE-EVALUATION CONSULTATION filed by Sound Transit:

Different than the 2011 Project, the Proposed Design Refinements would accommodate an at-grade trail connection between the East Lake Sammamish Trail and Redmond Central Connector with a bridge over Bear Creek. If funding is provided by King County, the missing link to the East Lake Sammamish Trail would be built by Sound Transit when the light rail extension is constructed.